# Software Project Proposal Template

| Proposal | Details |
| --- | --- |
| Project | [Project name] |
| Prepared for | [Client contact name, role, company] |
| Prepared by | [Your name or business name, email, phone] |
| Reference | [Your proposal number] |
| Date | [Date sent] |
| Valid until | [Date] |

## 1. Summary

You asked me to [build or change what] so that [the outcome the client wants, in their words]. I propose to deliver [the main result, in one sentence] in [number] phases over about [minimum] to [maximum] weeks, counted from the start described in section 8.

The [fixed price or estimated cost] is [currency and amount], paid as section 9 describes. The work includes [the two or three items that matter most to the client] and does not include [the one or two exclusions most likely to surprise them] (sections 3 and 4).

To go ahead, please accept by [date] as described in section 12. The first thing I will need from you is [the most important prerequisite].

## 2. Understanding of the problem

This is how I understand your situation, based on [the brief dated (date) and our call on (date)]. Please correct anything wrong or missing before accepting, because the scope and price below rest on it.

- **Today:** [How the work is done now, e.g. Orders arrive by email and staff type them into a spreadsheet by hand.]
- **The problem:** [What goes wrong because of that and how often. Use the client's own figures if they gave any.]
- **Who it affects:** [Customers, staff, a specific team]
- **What you want to be different:** [The result you were asked for, in terms the client can check.]
- **Constraints you mentioned:** [Deadline, budget limit, existing systems, rules the work has to follow.]
- **Still unclear:** [Each open question and how this proposal treats it until it is answered, e.g. Whether partial refunds are needed: this proposal assumes they are not, so S3 leaves them out.]

## 3. Scope

I will deliver the items below. The **Done when** column is how we both know an item is finished. Anything not listed here is not included.

| Ref | Item | What it includes | Done when |
| --- | --- | --- | --- |
| S1 | [Feature, e.g. Customer accounts] | [What gets built, e.g. Sign-up, sign-in and password reset by email] | [A check the client can do, e.g. A new customer can register, sign in and reset their password on the test site] |
| S2 | [Feature, e.g. Order list for staff] | [e.g. List of orders with search by order number, a filter by status and a way to change an order's status] | [e.g. Staff can find any test order by its number, filter the list by status and change an order's status] |
| S3 | [Integration, e.g. Card payments] | [Service and flows, e.g. Hosted checkout and full refunds through the payment provider; no subscriptions or partial refunds] | [e.g. A test payment and a full refund complete in the provider's test mode and appear in the order list] |
| S4 | [Data migration, if any] | [Source, format and volume, e.g. One CSV export of up to 5,000 customer records] | [e.g. Imported records plus rejected rows add up to the export's row count, and you get a list of the rejected rows] |
| S5 | [Test environment] | [e.g. A test site you can open, updated as each phase is delivered] | [e.g. You can open the test site at its address, and it shows the latest delivered work] |
| S6 | [Release work] | [e.g. Live environment, live deployment, scheduled database backups] | [e.g. The application runs at the live address on your hosting account, and the first scheduled backup has completed] |

### Technical details

- **Built with:** [Languages, frameworks, database]
- **Hosted on:** [Platform, and whose account it runs under]
- **Browsers and devices:** [e.g. Current versions of Chrome, Safari, Edge and Firefox on desktop; Chrome and Safari on phones]
- **Interface languages:** [Languages, and who provides the translations]
- **Expected usage:** [e.g. Up to 200 orders a day. Work to support a higher volume is a change request.]
- **Testing:** [What is tested and how, e.g. Automated tests for payment and order logic, manual testing for the rest]

## 4. Out of scope

These are not part of this proposal or its price. If you want any of them, tell me before accepting and I will price it as an option. After acceptance, they go through the change process in section 10.

- [Something the brief implied that you are not doing, e.g. A native iOS or Android app]
- [e.g. Writing, translating or entering content such as product descriptions]
- [e.g. Migrating any data beyond what S4 lists]
- [e.g. Visual design or branding beyond the designs you supply]
- [e.g. Security audits, penetration testing, or legal and compliance review]
- [e.g. Fees for hosting, domains, licences, app stores and third-party APIs, which you pay directly]
- [e.g. New features, hosting management, monitoring and maintenance. The support period in section 7 covers defects only]

## 5. Assumptions

The price and timeline depend on these points. If one turns out to be wrong, I will tell you as soon as I find out, and the right-hand column says what happens next.

| Ref | I am assuming that | If this turns out to be wrong |
| --- | --- | --- |
| A1 | [e.g. The payment provider's test mode covers every flow in S3] | [e.g. I propose a workaround and quote any extra days before building it] |
| A2 | [e.g. The customer export is one file with consistent columns] | [e.g. Cleaning the data is quoted as a change request] |
| A3 | [e.g. Final designs for every screen arrive by the date in P4] | [e.g. The timeline moves, and any design work or rework is quoted as a change request] |
| A4 | [e.g. You send comments on each phase in one message, with up to two rounds of revisions per phase. Fixing work that misses a Done when condition doesn't count as a round] | [e.g. Further rounds are charged at the day rate in section 10] |
| A5 | [e.g. The existing system's API stays as documented during the project] | [e.g. Rework caused by API changes is quoted as a change request] |

## 6. Client prerequisites

I need the following from you to keep to the timeline in section 8.

| Ref | What I need from you | Who provides it | By when |
| --- | --- | --- | --- |
| P1 | One named person who answers questions and approves work on your side | [Name, role] | [Before work starts] |
| P2 | Access to [code repository, hosting account, domain settings] | [Name] | [Before work starts] |
| P3 | Accounts, API keys and test credentials for [third-party services] | [Name] | [Before work starts] |
| P4 | [Final designs, text, images and logo] | [Name] | [Date] |
| P5 | [Data export or sample data] | [Name] | [Date] |
| P6 | [Legal text the product needs, e.g. Privacy notice and terms of use] | [Name] | [Date before release] |
| P7 | Answers to my questions within [2] working days | [Name] | Throughout the project |

If something on this list arrives late, the timeline in section 8 moves by at least the same amount. If a delay lasts more than [10] working days, I may take on other work in the gap, and the new timeline will depend on my availability at that point.

## 7. Deliverables

When the project is finished, you will have:

| Deliverable | Format or location | Delivered with |
| --- | --- | --- |
| Source code, with its history | [Your repository on (service)] | [Each phase] |
| Working application | [Live address, on your hosting account] | [Phase 5] |
| Database schema and migration scripts | [In the repository] | [Each phase] |
| Setup and deployment instructions | [README in the repository] | [Phase 5] |
| [Admin or user guide] | [Format and length] | [Phase 5] |
| [Handover session] | [e.g. One recorded video call of up to one hour] | [Phase 5] |

### Ownership

Once the final payment is received, the code written specifically for this project is yours. If the project stops early, the same goes for the work you have paid for under section 9. Third-party and open-source components stay under their own licences. I keep my general tools, libraries and know-how, and I can reuse them on other work.

### Support after delivery

For [30] days after you approve the last phase, I will fix defects at no charge. A defect means delivered work does not meet a **Done when** condition in section 3. This does not cover new features, changes in third-party services, or problems caused by changes someone else made to the code or hosting. Ongoing maintenance can be agreed separately.

## 8. Timeline

Work starts [number] working days after I have the deposit and prerequisites [P1 to P3], but not before [date]. The weeks below count from that start and show the latest I expect each phase to finish, so if you accept later, the calendar dates move with it. The whole project takes about [minimum] to [maximum] weeks, including your review time. The timeline also moves if a prerequisite in section 6 is late, work pauses under section 9 or a change order in section 10 says so.

| Phase | Work | Scope items | Finished by | What you review |
| --- | --- | --- | --- | --- |
| 1. [Setup] | [e.g. Test site, repository, data model] | [S5] | [End of week 1] | [e.g. The test site, running an empty application] |
| 2. [Core features] | [e.g. Customer accounts, order list] | [S1, S2] | [End of week 4] | [e.g. Both features on the test site] |
| 3. [Integrations and data] | [e.g. Card payments, customer import] | [S3, S4] | [End of week 7] | [e.g. Test payments and imported records] |
| 4. [Testing and fixes] | [e.g. Full run through the Done when conditions, defect fixes] | [S1 to S4] | [End of week 9] | [e.g. The list of checked conditions] |
| 5. [Release and handover] | [e.g. Live deployment, handover session] | [S6] | [End of week 10] | [e.g. The live application and documentation] |

[If the client has a fixed deadline, add: The release date of (date) is fixed. If time runs short, (scope item) moves to after the release, once we have agreed that in writing.]

**Reviews:** You have [3] working days to review each phase. If a review takes longer, the timeline moves by the extra time. Please send your comments in one message. A phase is approved when you confirm in writing (email is enough) that its **Done when** conditions are met. If a condition is not met, I fix it and send it back for review.

**No reply:** If I have no reply [5] working days after sending a phase for review, I will remind you once in writing. If there is still no reply [3] working days after the reminder, the phase counts as approved.

**Working pattern:** I will work on this project about [number] days a week and send a short written update every [weekday]: what was done, what comes next and anything I need from you.

## 9. Price and payment

[Keep either the fixed-price or the time-and-materials wording and delete the other.]

### Fixed price

The price for the work in section 3 is [currency and amount], [excluding or including] [VAT or other applicable tax]. It stays the same as long as the scope in section 3 and the assumptions in section 5 hold.

### Time and materials

I charge [currency and amount] per working day, [excluding or including] [VAT or other applicable tax], in half-day units. I estimate [minimum] to [maximum] working days, which comes to [currency and amount] to [currency and amount]. This is an estimate and not a fixed price. I will tell you when [80]% of the maximum has been used, and I will not go past the maximum without your written approval.

### Payment schedule

| Instalment | When I invoice it | Share | Amount |
| --- | --- | --- | --- |
| Deposit | On acceptance. Work starts once it is paid | [30]% | [Amount] |
| Second payment | When phase [3] is approved | [40]% | [Amount] |
| Final payment | When phase [5] is approved | [30]% | [Amount] |
| Total |  | 100% | [Amount] |

[For time and materials, replace this table with: A deposit of (amount) on acceptance, credited against the final invoice, then an invoice every (two weeks) for the days worked.]

### Payment terms

- **Invoices:** I send an invoice at each point above. Payment is due within [14] days of the invoice date, by [bank transfer] to the account on the invoice.
- **Currency and fees:** All amounts are in [currency]. Transfer fees are paid by [the sender].
- **Third-party costs:** You pay for hosting, licences and other services directly. If I need to pay for something on your behalf, I will ask for your written approval first and invoice it at cost.
- **Late payment:** If an invoice is more than [7] days overdue, I may pause work until it is paid. The timeline in section 8 moves by at least the length of the pause.
- **If the project stops early:** Either of us can stop the project with [10] working days' written notice. You then pay for the work done up to the stop date at the day rate in section 10, up to [the total price or, for time and materials, the estimated maximum]. Payments already made count towards this, and I refund anything paid above that amount. The one exception: if you are the one who stops the project, I keep the deposit even if it is more than the work done. I hand over all work that has been paid for.

## 10. Change process

A change is anything that adds to, removes from or alters what sections 3 to 8 describe. A defect is different: if delivered work does not meet a **Done when** condition, I fix it at no charge, up to the end of the support period in section 7.

1. You or I describe the change in writing. This is the change request, and email is enough. A request made on a call or in chat counts once one of us has written it down.
2. Within [2] working days I reply with whether it is already in scope. If it is not, I say how many days it adds or removes, what it costs or saves and how it moves the timeline.
3. You approve or decline in writing. Until you approve, I continue with the agreed scope and do not start the change.
4. I record each approved change in a numbered change order showing the price (for time and materials, the estimated maximum) and end date before the change, the change itself, and the same two figures after it. The change order then forms part of this proposal.
5. I invoice approved changes [with the next instalment or when the change is delivered].

Extra work is priced at [currency and amount] per working day, [excluding or including] [VAT or other applicable tax]. If a change would take less than [half a day], I may do it at no charge at my discretion, and I will still note it in writing so that we both have the same record of what was done.

## 11. Validity

This proposal is valid until [date], [30] days from the date at the top. After that, the price and timeline may change and I will need to confirm them again before work can start. I do not reserve a start date until you have accepted and paid the deposit.

## 12. Acceptance

To accept, sign below or reply by email with: "I accept proposal [reference] dated [date]." Then pay the deposit invoice. Work starts as described in section 8.

Accepting means you agree to sections 1 to 11 as written, along with any corrections we have both confirmed in writing. Any later change follows section 10.

This proposal does not cover confidentiality, data protection, liability or governing law. If you need any of those covered, tell me before accepting so that we can agree them in writing first.

[If you also have a contract, use this sentence instead of the paragraph above: This proposal is attached to our contract dated (date). If the two disagree, the contract takes priority.]

| Accepted by | Client | Developer |
| --- | --- | --- |
| Name | [Name] | [Name] |
| Role and company | [Role, company] | [Role, business name if any] |
| Signature |  |  |
| Date |  |  |
